ADU Builders & Contractors in Temple Terrace, FL

With 5 verified ADU contractors serving Temple Terrace, FL, homeowners have plenty of options for their accessory dwelling unit project. Local contractors ready to help specialize in everything from design-build to permit navigation.

📊 ADU Quick Facts for Temple Terrace

Avg. Cost/sqft

$144-$294

Permit Timeline

30-90 weeks

Max Size

1000 sqft

Setbacks

5ft sides

Top 5 ADU Contractors in Temple Terrace

🏗️

Temple Terrace, FL

E L A Contracting Group LLC — licensed ADU contractor in Temple Terrace, FL.

🏗️

Temple Terrace, FL

E L A Contracting Group LLC — licensed ADU contractor in Temple Terrace, FL.

🏗️

Temple Terrace, FL

PDC Diversified Services LLC — licensed ADU contractor in Temple Terrace, FL.

🏗️

Temple Terrace, FL

Pukta Corporation — licensed ADU contractor in Temple Terrace, FL.

🏗️

Temple Terrace, FL

Prime Build Contracting LLC — licensed ADU contractor in Temple Terrace, FL.

💰 How Much Does an ADU Cost in Temple Terrace?

Garage Conversion

$37,000 - $97,000

Converting existing garage to living space

Detached ADU

$94,000 - $244,000

New standalone unit (600-1,200 sqft)

Permit & Fees

$601 - $3,101

Plan check, permits, utility connections

* Costs vary based on size, finishes, site conditions, and contractor. Get quotes from multiple Temple Terrace contractors to compare pricing.

❓ Frequently Asked Questions About ADUs in Temple Terrace

How much does it cost to build an ADU in Temple Terrace?
The average cost to build an ADU in Temple Terrace ranges from $94,000 to $244,000, or approximately $144 to $294 per square foot. Garage conversions typically cost $37,000 to $97,000.
How long does it take to get an ADU permit in Temple Terrace?
The ADU permit process in Temple Terrace typically takes 30 to 90 weeks. California law requires cities to approve or deny ADU permits within 60 days of receiving a complete application.
What are the ADU size limits in Temple Terrace?
In Temple Terrace, detached ADUs can be up to 1000 square feet. Attached ADUs are limited to 50% of the primary dwelling or 1,200 sqft, whichever is less. Junior ADUs (JADUs) are limited to 500 sqft and must be within the existing home.
What is the setback requirement for ADUs in Temple Terrace?
Temple Terrace requires 5-foot setbacks from side property lines and 5-foot setbacks from rear property lines for new ADU construction. Converted structures (like existing garages) may maintain their current setbacks.
Do I need to provide parking for my ADU in Temple Terrace?
No parking is required for ADUs in Temple Terrace if your property is within half a mile of public transit, in a historic district, part of an existing multi-family building, or if the ADU is a garage conversion. Otherwise, one space may be required.

Also See ADU Contractors In

Ready to Build Your ADU in Temple Terrace?

Get free quotes from top-rated local contractors

Find Contractors Now